Skip to main content

 

CRRUA will be closed on June 19 in observation of Juneteenth.
The Camino Real Regional Utility Authority (CRRUA) has successfully finalized infrastructure repairs on Trevington Court following a water line break earlier today.

The Camino Real Regional Utility Authority (CRRUA) has successfully completed repairs on a water line break on Trevington Place.

Field personnel isolated the line and temporarily suspended water service at approximately 9:10 a.m. today, June 23, 2026, to conduct the necessary mechanical repairs. Crews finalized the repairs and fully restored water service to the affected properties at 11:44 a.m.

As a standard result of line depressurization and subsequent restoration, residents may encounter brief water discoloration or transient air pockets in their plumbing. If this occurs, consumers are advised to run internal cold water taps for 2–3 minutes until the water flows clear.

Regular system operations have resumed across the affected sector.